Preliminary Chores

Next Monday I’m buying a house on which I chose not to have a contingency due to condition.

The front of the house is the best view at this time.

We had a comprehensive inspection and unfortunately the house is in very rough condition so I have made a “let’s get started” list.

The electric box is on the side of the house.

Even before the inspection I had the electricity turned on.  And the estate agent had the bank send a man to dewinterize the house including turning on the water.

We were happy that the well pump worked when the electric was turned on.

Happily the electric works; the water runs and is potable.

The sides and back of the house are dirty and in some cases falling apart.

Urgent Projects:

  1. get list of contractors from real estate agent:  Electrician, Plumber, Roofer,  General contractor
  2. remove tree on power lines

    This evergreen tree has fallen on power lines which can cause a potential problem.
  3. call plumber – look at water heater, furnace, propane heater, all plumbing
  4. clean up old tractors, mowers, debris, etc., photograph and list on               Craigslist

    Fixing the sheds will have to wait.
  5. call oil company
  6. make plan for cleaning each room
  7. pull up carpet per room
  8. clean bathrooms

    The bathroom is very dirty but the dirt comes off easily.
  9. clean kitchen – test appliances

    Our inspector checked the stove and it works.
  10. clean laundry room – test appliances

    We’re not sure why the water heater doesn’t work.
  11. power wash deck, translucent stain

    The deck seems to be sturdy and dirty.
  12. check out dock by pond

    The dock near the pond seems to be weak and sinking.
  13. completely clean screen porch

    This porch is screened in but in rough shape.
  14. call roof contractor

    The roof is leaking steadily into the kitchen.
  15. tear down kitchen wall and ceiling

    The kitchen wall is soaked and needs to be removed.
  16. tear down bathroom wall
  17. Call internet/phone company

That should get us well on our way.

What system in your house is most important to you?

Author: Jo

Welcome to The Glade, where the second generation of renovations has just begun and the mania about our home, music and other passions fill our days and nights. We’re Charlie and Jo in the music world; Mary Jo and Charles to family; and JoJo and Charlie to each other. We are renovating a midcentury house in a Victorian historic district where we want to live there the rest of our lives. It's a 1946 house located in Maryland. We were married in this house. Thus far (pre-blog) we refinished cabinets, added a window seat (still working on the cushion), rearranged a wall in the guest house due to sink/vanity replacement, planted a vegetable garden, and other quick and not-so-quick fixes. So this latest zeal for construction is the result of my having lived here since 1997 and feeling a need to ready the house for the next chapter and beyond.

3 thoughts on “Preliminary Chores”

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

This site uses Akismet to reduce spam. Learn how your comment data is processed.