Slowly but surely Glade Cottage is becoming inhabitable. Just recently we purchased a small refrigerator for it.
The sub-list of the Master List is Glade Cottage only projects. We posted the original list at the end of June, 2011. This is what we’ve accomplished since then.
In the list below the completed projects have been struckthrough and linked to a detailed post if one has already been written.
-
Refinish coffee table
Paint bedHang new artworkPaint room – sand wall, paint walls Siamese EyesPaint desk and change hardware
Replace lighting fixture with ceiling fan
Paint and replace trim in bathroomDye and hang curtains
- Refinish tall chest of drawers
Paint bed side table
- Paint small wooden lamp and get shade
Lay new floor in bathroom
- Refinish floor in main room
- Rehang ceiling drop cloth
Fix small leak in washing machine line
Finish insulating atticClear more clutter from attic- Organize tools
Scrape, prime and paint outside trimPaint exterior accent color
Organize paint and suppliesSend shirts to son in FloridaReputty all windows
Paint ceiling
Fix leak under sink in bathroom
This is the left side of the room now.
Now with the ceiling fan installed the right side of the room looks like this.
The front wall and entrance are painted, curtained and furnished.
The large picture window is puttied and polished.